Service
Deck Repair and Refinishing in Meridian
Board replacement, ledger and flashing repair, structural fixes, and full strip and re-coat.
Meridian has a large stock of decks built in the 2000s subdivision wave, and many of them are now fifteen to twenty-five years into a climate that is hard on exposed wood. The failures follow a pattern. Surface boards check and cup first, which is cosmetic. Stair stringers and rail posts loosen next, which is a safety issue. The ledger connection and its flashing fail last and quietly, and that is the one that matters, because a ledger that is nailed rather than bolted, or flashed poorly, is the single most common cause of a deck coming away from a house. A repair scope starts with which of those three layers has failed, and that question is answered by looking, not by guessing from photos.
What the scope covers
- Structural assessment of ledger attachment, flashing, footings, and rail post connections
- Ledger re-bolting and re-flashing where the original connection was nailed or left unflashed
- Joist sistering, rim joist replacement, and stair stringer rebuilds
- Individual board replacement matched to the existing decking where the profile is still made
- Rail post hold-down upgrades on decks that predate current guard post detailing
- Full strip, clean, brighten, and re-coat with a penetrating semi-transparent finish
- Re-board over an existing frame where the frame is sound and correctly spaced
Reading further
The Meridian deck guide covers the whole process end to end. For numbers, work through the cost estimator or the Treasure Valley cost guide. Terms you have not run into before are in the deck glossary.
Questions about repair and refinishing
Repair the deck or rebuild it?
What does deck repair cost in the Treasure Valley?
How do I know if a deck is unsafe?
Can a gray, weathered deck be brought back?
How long does a refinish take?
From the Field Notes
More on repair and refinishing in the valley
Related Scopes
Things that get priced at the same time
Deck scopes overlap. Rail and stairs are part of nearly every build, cover is the most common addition, and framing for a future cover while the deck is open costs a fraction of retrofitting it later.
New Deck Construction
Ground-up deck builds off the back of the house, footings through rail, typical 1 to 3 weeks on site
Composite Deck Installation
Capped composite and PVC decking, the material most Meridian homeowners pick for a west-facing yard
Cedar and Wood Decks
Western red cedar and pressure treated builds, the lower entry price and the warmer surface underfoot
Covered Decks and Pergolas
Roofed deck extensions, pergolas, and shade structures for a west-facing Treasure Valley back yard
Thinking about a deck this season?
Call (208) 314-4914 or use the quote form for a free written price on any deck project in the Treasure Valley.