New Deck Construction in Meridian
Ground-up deck builds off the back of the house, footings through rail, typical 1 to 3 weeks on site.
A new deck starts at the dirt and finishes at the rail. Footings go in below the frost line, posts and beam carry the load, joists hang off a flashed ledger bolted to the house rim, and the decking runs last. In Meridian that usually means a flat back yard, a walkout door off the kitchen or great room, and a subdivision lot with recorded easements along the rear and side lines. Most new decks here land between 200 and 600 square feet and take one to three weeks on site once materials land. The two decisions that move the price most are decking material and whether the deck sits high enough to need a guard, which the 2018 International Residential Code triggers at more than 30 inches above grade.
What the scope covers
- Footings dug to bear on undisturbed soil below the frost line, poured and inspected before framing
- Pressure treated framing lumber, galvanized or stainless connectors throughout
- Ledger bolted to the house rim joist with approved corrosion resistant flashing above it
- Beam, post, and joist spans sized to the decking material rather than assumed
- Guards on any walking surface more than 30 inches above grade, per IRC R312
- Stairs at 36 inches minimum width with a handrail once there are four or more risers
- City of Meridian building permit pulled and inspections coordinated by the contractor
- A written price split across footings, framing, decking, rail, and stairs
Reading further
The Meridian deck guide covers the whole process end to end. For numbers, work through the cost estimator or the Treasure Valley cost guide. Terms you have not run into before are in the deck glossary.
Questions about new decks
How long does it take to build a deck in Meridian?
What does a new deck cost in Meridian, Idaho?
Do I need a building permit for a deck in Meridian?
How deep do deck footings have to go here?
Can the deck go anywhere in the back yard?
From the Field Notes
More on new decks in the valley
Related Scopes
Things that get priced at the same time
Deck scopes overlap. Rail and stairs are part of nearly every build, cover is the most common addition, and framing for a future cover while the deck is open costs a fraction of retrofitting it later.
Composite Deck Installation
Capped composite and PVC decking, the material most Meridian homeowners pick for a west-facing yard
Cedar and Wood Decks
Western red cedar and pressure treated builds, the lower entry price and the warmer surface underfoot
Covered Decks and Pergolas
Roofed deck extensions, pergolas, and shade structures for a west-facing Treasure Valley back yard
Deck Repair and Refinishing
Board replacement, ledger and flashing repair, structural fixes, and full strip and re-coat